Services

Main inspection of buildings

The Building Management and Maintenance Act (Zakon o upravljanju i održavanju zgrada, NN 152/24, Art. 52) requires the building manager to arrange regular and extraordinary inspections of the building in line with building regulations. Under the Technical Regulation for Building Structures (Tehnički propis za građevinske konstrukcije, Art. 22), the main inspection of a building's structure is carried out at least every 10 years, and a basic inspection every year.

We carry out main inspections for building managers and co-owners' representatives throughout Croatia. The inspection is carried out, and the report signed, by a licensed civil engineer, within the tasks of the civil engineering profession under Art. 50 of the Act on Physical Planning and Construction Activities (Zakon o poslovima i djelatnostima prostornog uređenja i gradnje). Afterwards you receive a report with a list of defects, repair deadlines and a maintenance plan for the next five years.

Send an enquiry · +385 91 444 6022 · WhatsApp

Who it is for

For all buildings covered by the Building Management and Maintenance Act: residential, mixed residential-commercial and commercial buildings and block garages. It is commissioned by building managers and co-owners' representatives.

  • Regular main inspection, at least every 10 years
  • Inspection after an earthquake, fire or other damage
  • Inspection before major work on the roof, façade or structure
  • Cracks, damp, corrosion or parts of the façade falling off

What we inspect

The load-bearing structure of the building and everything that depends on it. Before the visit we review the available documents: building and use permits, the design and earlier maintenance records.

  • Foundations, walls, columns, beams and floor slabs
  • Roof, stairs, balconies, loggias and railings
  • Garages and basements
  • We measure cracks and mark them with tell-tales, so the next inspection shows whether they are growing

What you receive

The main inspection report as a PDF, with photographs.

  • Defect register with severity rating and repair deadline
  • Classification into regular maintenance, urgent and necessary repairs, under the Building Management and Maintenance Act
  • Five-year plan and programme for maintaining the structure
  • Recommendations for further testing or a remediation design, where needed

How it works

  1. Enquiry. You send the building's address, approximate year of construction and number of flats. If you have documents, send them too.
  2. Offer. Scope of the inspection, deadline and price.
  3. Site visit. With the building manager and the co-owners' representative, with access to the roof, basement, garage and common areas.
  4. Urgent findings straight away. If we find something that cannot wait, we tell the building manager and the co-owners' representative immediately, not only with the report.
  5. Report. We hand it over and explain to the co-owners what is urgent, what is necessary and what is regular maintenance.

Regulations

We carry out main inspections throughout Croatia. For other services for existing buildings, such as legalisation and energy certificates, see the Services page.

Send an enquiry

Write the building's address and what you need. We reply the same working day.