For investors

How much may be built on a plot

The size of a plot does not tell you how much may be built on it. That is set by the spatial plan, through a few figures and rules. Here we explain what those rules are and show with an example how it is calculated, for a house, a villa or a residential building.

First: may anything be built at all

The figures that determine how much

Example calculation

A fictitious plot of 600 m², 20 m wide along the road and 30 m deep. The plan prescribes a kig of 0.3, a kis of 0.8, at most a ground floor, a first floor and an attic, a setback of 3 m from the boundaries and 5 m from the road, and 2 parking spaces per flat.

  1. Footprint: 600 m² × 0.3 = at most 180 m².
  2. All storeys together: 600 m² × 0.8 = at most 480 m².
  3. Buildable part of the plot: width 20 − 3 − 3 = 14 m, depth 30 − 5 − 3 = 22 m, so 308 m². A footprint of 180 m² fits within it.
  4. Storeys: 180 m² of ground floor and 180 m² of first floor make 360 m². That leaves at most 120 m² for the attic, up to the limit of 480 m².
  5. Parking: a house with two flats needs 4 parking spaces on the plot, and they take up part of the garden that might otherwise have been greenery.

On paper, 600 m² sounds like a lot. In reality, the limit is whichever rule “breaks” first: often parking, greenery or the shape of the plot, not the kig. The actual values are set out in the implementing provisions of the plan of your municipality or town and differ from place to place, sometimes even from zone to zone.

Where mistakes happen

What else to watch out for when buying, from the land register to the contract, is covered in the guide Buying land and building in Croatia and in the Checklist: buying land.

How we do it

Enter the plot number and the cadastral municipality on the Plot analysis page. You will see the plot on the cadastral map straight away. We then check the spatial plan in force and send you a written analysis: how much may be built, what the setbacks and heights are, and where the risks lie. For several plots, we analyse them as one or more building plots, and for a larger plot we also propose a subdivision according to the spatial plan.

Send your plot for analysis

Note: the example is fictitious and serves as an explanation. The rules and values for your plot are set by the spatial plan in force, and this text does not replace an analysis of the specific plot.

PDF guides and email course

Enter your email and you will receive our guides in PDF (buying land, how much may be built, the costs of buying and building, a sample contractor payment plan) and the course “Building in Croatia in 7 emails”: one short email every two days. Unsubscribe with one click.