How much may be built on a plot
The size of a plot does not tell you how much may be built on it. That is set by the spatial plan, through a few figures and rules. Here we explain what those rules are and show with an example how it is calculated, for a house, a villa or a residential building.
First: may anything be built at all
- Building zone. The spatial plan of the municipality or town determines whether the plot lies within a building zone. Outside it, residential construction is as a rule not possible.
- Urban development scheme. In the undeveloped and unserviced part of a building zone, construction is often possible only once an urban development scheme (urbanistički plan uređenja) has been adopted. If it has not yet been adopted, a plot may wait for years.
- Designated use. The plan determines what may be built in the zone: a family house, an apartment building, holiday apartments, or commercial or mixed use.
- Coastal belt. Stricter rules apply in the protected coastal area, especially close to the shore.
The figures that determine how much
- Site coverage ratio (kig). How much of the plot the building’s footprint may occupy. A kig of 0.3 on a 600 m² plot means a footprint of at most 180 m².
- Floor area ratio (kis). How large the total area of all storeys may be in relation to the area of the plot. A kis of 0.8 on a 600 m² plot means at most 480 m² in total. Plans differ in which storeys are counted, for example the basement.
- Height and number of storeys. The maximum height in metres and the maximum number of storeys, for example basement, ground floor, first floor and attic.
- Setbacks. The minimum distance of the building from the neighbours’ boundaries and from the road. This is often 3 m from the boundary, but the plan may require more, for example half the height of the building.
- Minimum and maximum plot area. A plot that is too small may not qualify as a building plot. For a large plot, the plan may allow subdivision into several building plots.
- Number of flats or units. The plan may limit the number of flats or holiday apartments in one building.
- Parking and greenery. The number of parking spaces per flat or holiday apartment, on the plot itself, and the minimum share of greenery on natural ground.
- Access. The plot must have access from a road of a prescribed minimum width.
Example calculation
A fictitious plot of 600 m², 20 m wide along the road and 30 m deep. The plan prescribes a kig of 0.3, a kis of 0.8, at most a ground floor, a first floor and an attic, a setback of 3 m from the boundaries and 5 m from the road, and 2 parking spaces per flat.
- Footprint: 600 m² × 0.3 = at most 180 m².
- All storeys together: 600 m² × 0.8 = at most 480 m².
- Buildable part of the plot: width 20 − 3 − 3 = 14 m, depth 30 − 5 − 3 = 22 m, so 308 m². A footprint of 180 m² fits within it.
- Storeys: 180 m² of ground floor and 180 m² of first floor make 360 m². That leaves at most 120 m² for the attic, up to the limit of 480 m².
- Parking: a house with two flats needs 4 parking spaces on the plot, and they take up part of the garden that might otherwise have been greenery.
On paper, 600 m² sounds like a lot. In reality, the limit is whichever rule “breaks” first: often parking, greenery or the shape of the plot, not the kig. The actual values are set out in the implementing provisions of the plan of your municipality or town and differ from place to place, sometimes even from zone to zone.
Where mistakes happen
- Only the plan’s maps are looked at, not the implementing provisions, which is where the figures are.
- An old plan is looked at. Plans change, and amendments are often in preparation.
- A cadastral plot is not the same as a building plot. A building plot sometimes requires cadastral plots to be merged or divided.
- Sloping ground, the shape of the plot and existing buildings reduce what can actually be fitted in.
What else to watch out for when buying, from the land register to the contract, is covered in the guide Buying land and building in Croatia and in the Checklist: buying land.
How we do it
Enter the plot number and the cadastral municipality on the Plot analysis page. You will see the plot on the cadastral map straight away. We then check the spatial plan in force and send you a written analysis: how much may be built, what the setbacks and heights are, and where the risks lie. For several plots, we analyse them as one or more building plots, and for a larger plot we also propose a subdivision according to the spatial plan.
Note: the example is fictitious and serves as an explanation. The rules and values for your plot are set by the spatial plan in force, and this text does not replace an analysis of the specific plot.
PDF guides and email course
Enter your email and you will receive our guides in PDF (buying land, how much may be built, the costs of buying and building, a sample contractor payment plan) and the course “Building in Croatia in 7 emails”: one short email every two days. Unsubscribe with one click.