Checklists for investors
Five short lists in the order in which a project unfolds. You can print each one or save it as a PDF and tick off what you have checked.
- Buying landOwnership and encumbrances, designated use, access, building conditions, restrictions, boundaries, contract→
- Documents and steps for a building permitA general overview from design to decision→
- Contractor’s bidNine points for reviewing a bid before signing→
- Contracting constructionTurnkey or remeasured on the measurement book: what to check in the contract→
- Handover of the buildingTechnical inspection, use permit, defects, warranties, documentation→
These are general checklists, not legal advice. They do not replace a professional assessment. For your specific case, consult a designer, lawyer, notary or another suitable professional.