Checklists for investors

Checklist: documents and steps for a building permit

In Croatia a building permit (građevinska dozvola) is issued under the Building Act and the Spatial Planning Act and their implementing regulations. The procedure and the documents required depend on the type of building, its location and the regulations in force, which change.

The list below gives a general overview. The exact list for your building is established by the designer or the authority competent to issue the permit.

1. Before the design

2. The design

3. Special conditions and approvals

4. The permit application

5. Course of the procedure

6. After the permit

The regulations, procedures and documents for permits change, and some simpler works may be built without a building permit on the basis of another act. A reliable list should always be confirmed with the designer or the competent administrative authority. This is a general checklist, not legal advice. It does not replace a professional assessment. For your specific case, consult a designer, lawyer, notary or another suitable professional.

Bastion dizajn d.o.o.

← Back to the For investors page   All checklists