Design and building permit, anywhere in Croatia

For a building permit you need the right to build on the plot, a geodetic survey, a main design covering all engineering disciplines and the special conditions of the public authorities. We prepare all of this and handle the procedure up to the permit, for houses, villas, residential and commercial buildings anywhere in Croatia. The application is submitted electronically through the eDozvola system, so it does not matter where your land is.

Check the plot before the designIntro call, 20 min, free

Send an enquiry · +385 91 444 6022 · WhatsApp

Before the design

We look at the plot and the spatial plan: whether you may build, how much and what. You know where you stand before you pay for a design.

  • Plot and spatial plan analysis
  • Concept design in several variants

Design

We design in all phases under the current Croatian Building Act. The main design is delivered as a complete package with all disciplines and a bill of quantities, so the budget exists before the first spade goes in.

  • Concept and main design
  • Architecture, structures, electrical, water and drainage, mechanical, building physics, fire protection
  • Bill of quantities

Building permit

We obtain the special conditions and connection conditions, submit the application, answer requests for additional documents and see the procedure through to the permit.

Frequently asked questions

How much do the design and building permit cost?

The price of the design depends on the type and size of the building and on which engineering disciplines are needed. We send an offer with scope, deadline and price after the intro call. Besides the design, the investor also pays administrative fees and the utility contribution (komunalni doprinos). All items are in the guide Costs of buying land and building in Croatia.

How long does it take to get a building permit?

It depends on the type of building, the special conditions of the public authorities and the office that issues the permit. Approximate durations of all phases are on the page How long it takes.

Do I need a permit for a garage, an outbuilding or a pool?

It depends on the type and size of the structure. Some smaller structures do not need a building permit, but they must still comply with the spatial plan. We check what exactly your plot requires under the regulations and the spatial plan.

What if I am not allowed to build what I want on the plot?

That is why we review the spatial plan before the design: how much may be built, how many storeys and at what distance from the boundaries. More in the guide How much may be built on a plot, and for your own plot order a plot analysis.

Do I have to come to the office?

No. We work by email, phone and video call. For the geodetic survey we send a licensed surveyor to the site.

How we work remotely

  1. Introductory call, 20 minutes, free of charge. By phone or video call (in English or Croatian), or in writing in your language. You tell us what you are planning; we tell you what it takes and how long it will take.
  2. Plot analysis. A paid written review of what the spatial plan allows on your plot.
  3. Offer. Scope, timeline and price for the design and permit.
  4. Design and permit. We work by email and video call, and there is no need to visit the office. For the survey, we send a licensed surveyor to the site.

A lawyer checks the ownership and handles the purchase contract. We work with the lawyer, but we do not replace them. Construction, supervision and site management are available in Zadar and the surrounding area. See selected work on the Projects page.

Send an enquiry

Tell us what you are planning. A few sentences are enough; we will agree the rest in a conversation.